Cubicles & Workstations — Expert Answer

How do you properly demo and remove old cubicle systems from an office?

Cubicle demolition is a multi-step process: (1) disconnect all power from integrated cubicle panels (work with an electrician); (2) document the layout with photos for reference; (3) remove workstation components (shelves, overhead bins, pedestals) before disassembling panels; (4) panels typically unlatch and lift apart once connecting hardware is removed; (5) spine systems disassemble from the end in; (6) dispose of or sell/donate materials responsibly. Full cubicle demo for a 50-station office typically takes a 2–3 person crew one to two days. FindOfficeFurniture.com can advise on replacement cubicle systems — call 888-719-4960 for the best deals on new workstations.
← What workstation setup works best for an engineering or technical department?What is the practical difference between a cubicle tile system and a traditional panel system?… →